Installation and maintenance of universal material testing machine

2016-03-08 17:20:48   
1, installation
The universal material testing machine is installed in a clean, dry and uniform temperature inside the house at the same time, we should consider the possibility of on the machine for a long long beam bending test and the possibility using mirror extensometer test, so around in the testing machine should be set aside enough spare area.
Universal material testing machine body and a dynamometer installed don't need special foundation, only according to the foundation drawing prepare general foundation and leave holes of anchor bolts pouring solid can.
Find universal material testing machine body level, level instrument is put in the outer circle of the cylinder according to the frame of vertical and horizontal two position and the horizontal direction to find good level, with a precision in the horizontal instrument 0.10/1000 mm find + 1 case, not usually at the lower part of the base and iron pad to adjust. The dynamometer top two holes on the Yibei again when installing the steel wire rope wear.
Dynamometer level is very important, find the level of the pendulum bar on the left side and standard wiring reticle alignment the real, then bend ruler on placed on a large surface of the upper lever with the level of appearance 0.1/1000 mm put on the curve ruler find + 2 squares. When not in the base of the bottom of the iron, and must be placed on the pendulum and not hanging thallium is a pointer to the positive zero does not move.
The dynamometer iron gate above open check line of small hammer line is wound on the pointer coaxial pinion groove, thread length should be appropriate, not too long or too short, the limit for the longest cannot touch the evacuation remember diaphragm and the shortest for small gear to rotate a week aging hammer will not run into a small gear.
2, universal material testing machine to take over:
In the installation of pipe communicated with dynamometer subject should first wash with diesel oil, do not make any contaminants in the tube, in order to ensure the oil clean.
Should pay attention to gasket is complete, if not complete shall be supplied with this new washer machine installed to prevent oil leakage at high pressure.
3, oil specifications selection introduction
High quality medium viscosity mineral oil should be used in hydraulic transmission. In the oil or water, acid and other mixture, in the ordinary temperature should not decompose, the constant thick, and before filling in the machine, the oil must be filtered. Due to improper use of oil, will cause the valve and the oil circuit blockage and the machine has the potential to produce vibration, which will affect the normal operation of the test machine. Reference specification for oil:
Specific gravity: 0.86 - 0.97
Freezing point: -15 to -20
According to the actual situation can also be used in domestic 50 - 30 oil
4, filling and oil
Opened Dynamometer on the left side of the iron gate, you can see the wire mesh filter, when filling oil is through the oil filter injection tank, once poured into the oil volume of about 28 liters, to tank outside the top loading design of the oil level indicator for quasi, used oil specifications can see oil specifications selection is introduced.
Open before starting test machine, must from the fuel tank to the middle of pump pipeline installed cocks, cocks reticle and Guan Zicheng line, said between the oil tank and the oil pump oil flow, such as orthogonal reticles and pipe, said the closure.
When you put the oil dynamometer at the bottom left of the nozzle can be opened, on oil's use of the term according to the local climate, such as the discovery of oil began to mix foul cannot use should be replaced with new oil, want to wipe the bottom of the tank or things fall out put net oil and unloading dynamometer at the bottom left of the circular cover can be, after must be good.
5, electricity
Electrical installations of universal material testing machine is equipped with in the dynamometer and a magnetic starter button can be used to manipulate and small transformer, power input is 380 volts, the output voltage is 6 volts, and on an ergometer front right above a 6.3 volt small lights a.
Universal testing machine factory power supply wiring is 380V, magnetic starter coil is 380 volts, attracted from the power supply wire, through the dynamometer before cover receives on the wiring board. All wiring can refer to the instructions attached to the electrical wiring, connect the power and open the path of oil tank and the oil pump bolt, other inspection departments after, ergometer Table button to start, trial operation of the pump motor, observe the direction of rotation of the flywheel is consistent with the direction of the arrow head of flywheel, such as does not conform to should change the power joint so that the same, to operate under the jaw seat lifting motor, check jaw base lifting movements is shown on the button text and line, to check a super and super load button is combined.
6, lubrication
Gland of the top of the base body is provided with filling hole and through the injection hole to lubricate the nut, lower jaw seat lifting screw thread, according to the usage should be regular lubrication to avoid wear and tear hindered rotation.
After the main body is installed, the base is provided with a hole of the oil needle, and the oil is injected into the oil tank by a funnel, and the oil is injected into the oil tank by 30 millimeters.
Dynamometer in at the two ends of the main shaft ball bearing, usually are not allowed to try to lubrication, so as to avoid falling of the sensitivity of the sludge hinder precise mechanism, if it is to use a longer life must remove the internal available kerosene wash into very small amount of high quality lubricating oil, but enough to prevent the corrosion, installed after a standard dynamometer re calibration.
Pump without a screw block. After installation, beginning with the unscrew it. To the internal pump injected a large number of oil, after such as internal oil because of prolonged use bad, the screw under the pump plugging twist open, re poured into, if the machines are often used with about once a month for a time.
7, the initial operation and commissioning of the oil pump
Dynamometer mesa press the button you can start and stop the pump rotation, when the universal material testing machine installed after first operation or changes in the joints of the electric wires

previous_page:Instructions for use of Marshall electric hammer
next_page:最后一頁

<ALL>

Telephone: 
0086-10-65469689
Address:Room1928
Block1,DongyaSanhuan
Majiapu Road(W),Beijing
 

京ICP備16005974號-1
主站蜘蛛池模板: 国产精品久久久久久超碰| 久久精品无码精品免费专区| 欧美激情一区二区三区成人| 国产成人精品综合在线观看| 国产美女爽到喷出水来视频 | 成年女人毛片免费视频| 亚洲av无码一区二区乱孑伦as| 人妻免费久久久久久久了| 玩弄丰满奶水的女邻居| 无码人妻品一区二区三区精99| 日韩人妻精品一区二区三区视频| 50岁熟妇大白屁股真爽| 色视频www在线播放国产人成| 国产精品无码av一区二区三区| 久久久久99精品成人片欧美| 国产精品18久久久久久麻辣| 国产无遮挡a片又黄又爽| 久久无码专区国产精品| 中文无码精品a∨在线观看不卡| 东京道一本热中文字幕| 久久夜色精品国产网站| 和岳每晚弄的高潮嗷嗷叫视频| 亚洲av中文无码乱人伦在线播放| 亚洲精品无码不卡在线播he| 人妻少妇精品中文字幕av蜜桃| 国产乱人伦偷精品视频色欲| 免费无码av片在线观看潮喷| 精品午夜福利1000在线观看| 日韩人妻无码精品免费shipin| 亚洲av片不卡无码久久| 久久婷婷五月综合色中文字幕 | 精品亚洲成a人在线观看青青| 中文字幕人妻av一区二区| 亚洲熟妇自拍无码区| 亚洲人成色77777在线观看| 伊人色综合一区二区三区影院视频| 午夜天堂精品久久久久| 欧美性猛交xxxx乱大交极品| 国产播放隔着超薄丝袜进入| 天堂…中文在线最新版在线| 中文有码亚洲制服av片|